CHAOS
MRO Handover System
Base Maintenance Intelligence Platform
Invalid credentials — try again.
EASA Part-145.A.47 Compliant · CHAOS Aviation
Handover Detail
CHAOS
MRO Base Maintenance
Shift Handover Intelligence
Part-145.A.47
LS
📋 Work Orders: No file | 📦 Materials: No file
A/C:
✅ All shift handovers documented · Real-time material tracking active Part-145.A.47 ✓
📈 Work Order Progress
WOs Total
🗂 Zone Overview
⛔ Blocked — Material Shortage
Work Orders — All
WO NumberJCNDescriptionZoneMaterialStatusAction
Material Tracking — JCN Details
JCNWODescriptionPart NumberAlt PNQtyZoneETAStore StatusNotes
Shift Handover —
Part-145.A.47 Record
👤 Shift Information
Morning — 06:00 to 14:00
📝 Safety & Notes
Zone Progress — Auto-loaded from Work Orders
Open Work Orders — Handover Status
✅ WOs Closed This Shift
No WOs closed yet this shift.
✍ Digital Signatures — Part-145.A.47
Outgoing Shift (B1 Certifying Staff)
Incoming Shift Supervisor
Shift Handover History
Audit Trail
🛡 Complete immutable record of all actions, closures & signatures. Supports EASA Part-145.A.47. Part-145.A.47 ✓
📚 Aircraft Engineer Logbook — LST/MOE3.9/03-1
Form No. LST/MOE3.9/03-1 Rev.7 · 2025-05-08 · PL.145.023 Entries auto-created when WO is closed with B1 stamp
✅ Logbook entries are created automatically when you close a Work Order with a B1 stamp. You can also add manual entries below.
Engineer:
Stamp / Lic:
Total entries: 0
Date A/C Reg. ATA Task Detail / Task Number Maintenance type Privilege
A/B1/B2/C
Task type Type of activity Stamp WO 🗑
BaseLineComp. FOTSGHR/IMELTSMODREPINSP TrainPerf.Super.CRS
* Block Signature — task performance must be confirmed by Engineer who issued CRS (see Form fill up guideline)
✅ MOE Compliance Dashboard
🛡 Compliance evaluated from work orders, materials, handovers and logbook data. Part-145.A.47
🛡 Zone Compliance
⚠️ Active Deviations
✅ Part-145 Checklist
🛡 Readiness Check — WO
📷 Task Card Scanner — AI OCR
📷
Drop task card here or click to upload
Supports JPG, PNG, HEIC (photo of physical card) · PDF task cards
Claude AI will read and extract WO number, description, zone, stamp, findings
Task card preview
Done
⚠️
Shift Handover Required Before Sign Out
Part-145.A.47
⛔ You have unfinished tasks (STARTED but not FINISHED). You must document them in the shift handover before signing out. This is mandatory per Part-145.A.47.
For each task below, describe the current status and any safety considerations for the incoming shift:
📈 Column Mapper
Map each field to the correct column from your file. Required * fields must be mapped.
Required
Optional
📋 Work Order Field Mapper
Map XML fields to CHAOS work order fields.
Required
📄 PDF Work Orders — Extracted Data
Review the extracted work orders. Click Import All to load them into CHAOS.
📋 Zone Advisor — Work Sequence Guide
✓ Default guide active — 6 zones, 5 phases each
👥 Personnel & Zone Assignment
📋 Import the daily roster each morning to assign engineers to zones. Each B1 sees only their assigned zone when they log in. Managers and Team Leaders always see all zones.
📅 Today's Zone Assignments
StampNameRole MONITORING ACCESS Active Zone Actions
CABIN CARGO ENGINE AVIONICS LDG GEAR FLT CTRL
No personnel loaded. Import roster or add manually.
⚡ Creator Dashboard
⚡ CREATOR mode — full system access, all zones, all modules, all tenants. Changes here affect the live system.
📋
Daily Zone Assignment
Welcome, .
Your zone assignment for today is:
⚙️ Module Management
Enable or disable modules for this MRO. Changes apply immediately and are saved to the cloud.